Join Our Mailing List
Your Name

Email Address



 Latest News

July Update



Online Brochure

You can download a copy of our brochure in pdf format here.

Download Brochure




FAQ's

Q: How long does delivery take?

A: If ordered by 3:00pm, most orders are delivered next day.

 

Q: What means of payment do you take?

A: Cheques, Credit Cards, Debit Cards are all accepted.

 

Q: Do you use Environmentally Friendly packaging?

A: Yes.  To date all boxes Go Geothermal Ltd has sent out have come from a recycled source.

 

Q: How do I Pressure Test our system?

A: Please see info below:

Test Procedure for Horizontal Pipes (i.e. not probes)

This test procedure is appropriate for detecting major leaks in short lengths of small diameter pipes.

1. In this procedure, the creep in polyethylene is sustained by maintaining the selected test pressure for a period of 30 minutes.  This is achieved by additional pumping during the initial 30 minute period.

2. The pressure should then be reduced rapidly from the system to a nominal pressure of approximately 2 bar at which point the control valve should be closed and the system isolated.

3. A record should be made of the pressure readings at the following intervals:

• Every 2 minutes for the first 10 minute period
• Every 5 minutes from 10 to 30 minutes
• Every 10 minutes from 30 to 90 minutes

Within a 90 minute period a good indication will normally be achieved as to the integrity of the pipe section.

If during the 90minute period there is a falling away of pressure, this would indicate a leak within the system.

4. The resulting graph for a leak-tight system should have a characteristic profile similar to that shown in the following diagram.

 

Pressure Test Procedure for Probes/Ground Loops to follow shortly.